Let's talk(847) 414-4272

Guides / 4 phases

The website launch checklist.

Most redesign losses come from missing redirects and lost content, not the design. This checklist covers before, during, launch day and after.

By Nick IrmoNick Irmo · 4 steps · 15 tasks

0 of 15 done
  1. 01

    Before design

    Benchmark and inventory everything.

  2. 02

    During the build

    Build for speed, structure and conversion.

  3. 03

    Launch day

    The noindex tag has ruined more launches than bad design.

  4. 04

    The month after

    Watch closely, fix fast.

Your checkmarks are saved in this browser only.